Feeling the pressure a little bit as we have only got a week left until the exhibition. Me and Lucy have headed up to the 3D labs today to start construction of our installation. We began by planning out the basic shape of our path by laying out the lengths of wood that Jenna had gathered for us. Then i put together a quick checklist of things i needed to do in order to get the path constructed as efficiently as possible.
Below Are some of the pictures we took of the layout.
No comments:
Post a Comment